GRUPO ZARAGOZÁ STARTS WORK ON THE GRIJOTA I SOLAR PLANT (50 MW) LOCATED IN BECERRIL DE CAMPOS (PALENCIA)
The project, located in the municipality of Torrejoncillo del Rey (Cuenca), was developed, designed and built by GRUPO ZARAGOZÁ....

The project, located in the municipality of Torrejoncillo del Rey (Cuenca), was developed, designed and built by GRUPO ZARAGOZÁ....
Grijota II PVPP is located in the municipalities of Becerril de Campos, Villaumbrales and Husillos, and has a capacity of 50 MWp, equivalent to the annual consumption of 30,000 homes. The works will create five direct and 185 indirect jobs. The schedule for the end of construction...
VILLANUEVA II solar photovoltaic power plant (PVPP) is located in the municipality of Torrejoncillo del Rey, in Cuenca province. Villanueva II PVPP, now under construction, will have 49.99 MWp of installed capacity. This clean energy generating plant consists of 131,544 photovoltaic panels installed on a total surface...
GRUPO ZARAGOZÁ annually renews its operation and maintenance (O&M) service at the 2.27MW LA RINCONADA PV plant, located in Córdoba (Spain). We have been doing this for more than 13 years, since its launch in May 2010. GRUPO ZARAGOZÁ thus continues maintaining and concurrently expanding its portfolio...
The VILLANUEVA plant, with an installed capacity of 49.99 MWp, has 76,896 PERC technology photovoltaic modules mounted on a structure with a single-axis tracker. It will generate more than 100,300 MWh of clean, renewable energy per year and avoid atmospheric emissions of approximately 79,951.80 Tn/year of...
This plant has an installed capacity of 49.97 MWp and has been producing clean, inexhaustible, environmentally friendly energy since 27 April 2023. The plant’s total surface area is 86.439 hectares, equivalent to approximately 96 football fields, and is located in Torrejoncillo del Rey, in the province...
This project is exceptional in that, despite the State of Emergency caused by the Covid-19 global crisis, it met all of its construction deadlines and was energised in May 2020. Since then, this plant located in Bonete (Cuenca) has been operating at full capacity, being monitored...
GRUPO ZARAGOZÁ has obtained the Environmental Impact Statement (EIS) for the construction of the AYORA I photovoltaic park in the municipalities of Jarafuel and Zarra (Valencia) The plant will have an installed capacity of 49.97 MWp capable of producing 100.505 MWh and will avoid the emission...
This is the Villanueva plant, with an installed capacity of 49.99 MWp that will generate more than 250 jobs during its construction, which is expected to begin during Q1 2023 and 3 permanent on-site jobs for the operation and maintenance of the installation. It will have...
GRUPO ZARAGOZÁ has obtained the Environmental Impact Statement (EIS) for the construction of the RENEDO photovoltaic park in the municipalities of Castronuevo de Esgueva, Renedo de Esgueva, Tudela de Duero and Valladolid (Valladolid). The plant will have an installed capacity of 49.98 MWp capable of producing...