GRUPO ZARAGOZÁ begins the construction of its first solar park located in Talayuela (Cáceres).

This is the Talayuela III plant, with an installed capacity of 21.40 MWp which will generate more than 150 jobs during its construction.

It will have 32.832 photovoltaic modules of PERC technology mounted on a structure with a single-axis tracker and will generate over 43,714 MWh per year which will avoid emission into the atmosphere of approximately 34,845 Tn/Year of CO₂.