{"id":10231,"date":"2023-09-12T12:24:32","date_gmt":"2023-09-12T10:24:32","guid":{"rendered":"https:\/\/www.grupozaragoza.com\/?p=10231"},"modified":"2023-10-04T10:09:10","modified_gmt":"2023-10-04T08:09:10","slug":"grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca","status":"publish","type":"post","link":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/","title":{"rendered":"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA)"},"content":{"rendered":"<p>VILLANUEVA II solar photovoltaic power plant (PVPP) is located in the municipality of Torrejoncillo del Rey, in Cuenca province.<\/p>\n<p>Villanueva II PVPP, now under construction, will have 49.99 MWp of installed capacity.<\/p>\n<p>This clean energy generating plant consists of 131,544 photovoltaic panels installed on a total surface area of 116.8 ha, although the area occupied by the panels is 26.7 ha.<\/p>\n<p>As always, GRUPO ZARAGOZ\u00c1 development team has designed an installation with as minimal occupation as possible, along with only the strictly required permeable fencing to reduce any \u201cbarrier effect\u201d for the area\u2019s fauna.<\/p>\n<p>Furthermore, we created a vegetation screen at least five metres wide around the installation\u2019s perimeter, using native species with low water requirements, which are attractive to bees.<\/p>\n<p>Other measures incorporated to favour entomological fauna include mowing as little as possible , respecting tree specimens, applying preventive measures against fire hazards (such as fire breaks and equipment) and using grazing cattle and\/or sheep for clearing (thereby creating positive synergies with the area\u2019s livestock farmers).<\/p>\n<p>Construction and development of our PVPPs aims to work with towns to attain the goals and achievements of a sustainable environmental energy policy.<\/p>\n<p>These goals are underpinned by the following fundamental principles:<\/p>\n<ul>\n<li>Reducing energy dependence,<\/li>\n<li>Harnessing renewable energy resources,<\/li>\n<li>Diversifying supply sources by incorporating the least polluting ones,<\/li>\n<li>Reducing greenhouse gas emission rates,<\/li>\n<li>Facilitating compliance with the National Renewable Energy Action Plan (NREAP).<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>VILLANUEVA II solar photovoltaic power plant (PVPP) is located in the municipality of Torrejoncillo del Rey, in Cuenca province. Villanueva II PVPP, now under construction, will have 49.99 MWp of installed capacity. This clean energy generating plant consists of 131,544 photovoltaic panels installed on a&#8230;<\/p>\n","protected":false},"author":4,"featured_media":10158,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[73,88],"tags":[],"class_list":["post-10231","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-en","category-nacional-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA) - Grupo Zaragoz\u00e1<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA) - Grupo Zaragoz\u00e1\" \/>\n<meta property=\"og:description\" content=\"VILLANUEVA II solar photovoltaic power plant (PVPP) is located in the municipality of Torrejoncillo del Rey, in Cuenca province. Villanueva II PVPP, now under construction, will have 49.99 MWp of installed capacity. This clean energy generating plant consists of 131,544 photovoltaic panels installed on a...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo Zaragoz\u00e1\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-12T10:24:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-04T08:09:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"MARKETING\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"MARKETING\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/\"},\"author\":{\"name\":\"MARKETING\",\"@id\":\"https:\/\/www.grupozaragoza.com\/#\/schema\/person\/fbb75be1a91cd591811151e34788f9e9\"},\"headline\":\"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA)\",\"datePublished\":\"2023-09-12T10:24:32+00:00\",\"dateModified\":\"2023-10-04T08:09:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/\"},\"wordCount\":244,\"publisher\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg\",\"articleSection\":[\"News\",\"National\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/\",\"url\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/\",\"name\":\"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA) - Grupo Zaragoz\u00e1\",\"isPartOf\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg\",\"datePublished\":\"2023-09-12T10:24:32+00:00\",\"dateModified\":\"2023-10-04T08:09:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage\",\"url\":\"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg\",\"contentUrl\":\"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg\",\"width\":2560,\"height\":1440},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.grupozaragoza.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.grupozaragoza.com\/#website\",\"url\":\"https:\/\/www.grupozaragoza.com\/\",\"name\":\"Grupo Zaragoz\u00e1\",\"description\":\"Grupo Zaragoz\u00e1 desarrolla, construye (EPC) y mantiene (O&amp;M) Plantas Fotovoltaicas\",\"publisher\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.grupozaragoza.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.grupozaragoza.com\/#organization\",\"name\":\"Grupo Zaragoz\u00e1\",\"url\":\"https:\/\/www.grupozaragoza.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.grupozaragoza.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2017\/08\/logo_zaragoza.png\",\"contentUrl\":\"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2017\/08\/logo_zaragoza.png\",\"width\":676,\"height\":180,\"caption\":\"Grupo Zaragoz\u00e1\"},\"image\":{\"@id\":\"https:\/\/www.grupozaragoza.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/grupozaragoza\/\",\"https:\/\/www.instagram.com\/grupozaragoza_com\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.grupozaragoza.com\/#\/schema\/person\/fbb75be1a91cd591811151e34788f9e9\",\"name\":\"MARKETING\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.grupozaragoza.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/33f112a6621197994ea1e32ea1b347ad45be37f5a9512f0de4b7600bbc051dc4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/33f112a6621197994ea1e32ea1b347ad45be37f5a9512f0de4b7600bbc051dc4?s=96&d=mm&r=g\",\"caption\":\"MARKETING\"},\"url\":\"https:\/\/www.grupozaragoza.com\/en\/author\/marketing\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA) - Grupo Zaragoz\u00e1","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/","og_locale":"en_US","og_type":"article","og_title":"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA) - Grupo Zaragoz\u00e1","og_description":"VILLANUEVA II solar photovoltaic power plant (PVPP) is located in the municipality of Torrejoncillo del Rey, in Cuenca province. Villanueva II PVPP, now under construction, will have 49.99 MWp of installed capacity. This clean energy generating plant consists of 131,544 photovoltaic panels installed on a...","og_url":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/","og_site_name":"Grupo Zaragoz\u00e1","article_published_time":"2023-09-12T10:24:32+00:00","article_modified_time":"2023-10-04T08:09:10+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg","type":"image\/jpeg"}],"author":"MARKETING","twitter_card":"summary_large_image","twitter_misc":{"Written by":"MARKETING","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#article","isPartOf":{"@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/"},"author":{"name":"MARKETING","@id":"https:\/\/www.grupozaragoza.com\/#\/schema\/person\/fbb75be1a91cd591811151e34788f9e9"},"headline":"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA)","datePublished":"2023-09-12T10:24:32+00:00","dateModified":"2023-10-04T08:09:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/"},"wordCount":244,"publisher":{"@id":"https:\/\/www.grupozaragoza.com\/#organization"},"image":{"@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage"},"thumbnailUrl":"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg","articleSection":["News","National"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/","url":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/","name":"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA) - Grupo Zaragoz\u00e1","isPartOf":{"@id":"https:\/\/www.grupozaragoza.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage"},"image":{"@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage"},"thumbnailUrl":"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg","datePublished":"2023-09-12T10:24:32+00:00","dateModified":"2023-10-04T08:09:10+00:00","breadcrumb":{"@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#primaryimage","url":"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg","contentUrl":"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2023\/09\/20230824_083254-1.jpg","width":2560,"height":1440},{"@type":"BreadcrumbList","@id":"https:\/\/www.grupozaragoza.com\/en\/noticias-en\/grupo-zaragoza-is-building-villanueva-ii-the-second-photovoltaic-plant-in-torrejoncillo-del-rey-cuenca\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.grupozaragoza.com\/en\/"},{"@type":"ListItem","position":2,"name":"GRUPO ZARAGOZ\u00c1 IS BUILDING VILLANUEVA II: THE SECOND PHOTOVOLTAIC PLANT IN TORREJONCILLO DEL REY (CUENCA)"}]},{"@type":"WebSite","@id":"https:\/\/www.grupozaragoza.com\/#website","url":"https:\/\/www.grupozaragoza.com\/","name":"Grupo Zaragoz\u00e1","description":"Grupo Zaragoz\u00e1 desarrolla, construye (EPC) y mantiene (O&amp;M) Plantas Fotovoltaicas","publisher":{"@id":"https:\/\/www.grupozaragoza.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.grupozaragoza.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.grupozaragoza.com\/#organization","name":"Grupo Zaragoz\u00e1","url":"https:\/\/www.grupozaragoza.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupozaragoza.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2017\/08\/logo_zaragoza.png","contentUrl":"https:\/\/www.grupozaragoza.com\/wp-content\/uploads\/2017\/08\/logo_zaragoza.png","width":676,"height":180,"caption":"Grupo Zaragoz\u00e1"},"image":{"@id":"https:\/\/www.grupozaragoza.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/grupozaragoza\/","https:\/\/www.instagram.com\/grupozaragoza_com\/"]},{"@type":"Person","@id":"https:\/\/www.grupozaragoza.com\/#\/schema\/person\/fbb75be1a91cd591811151e34788f9e9","name":"MARKETING","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupozaragoza.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/33f112a6621197994ea1e32ea1b347ad45be37f5a9512f0de4b7600bbc051dc4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/33f112a6621197994ea1e32ea1b347ad45be37f5a9512f0de4b7600bbc051dc4?s=96&d=mm&r=g","caption":"MARKETING"},"url":"https:\/\/www.grupozaragoza.com\/en\/author\/marketing\/"}]}},"_links":{"self":[{"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/posts\/10231","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/comments?post=10231"}],"version-history":[{"count":3,"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/posts\/10231\/revisions"}],"predecessor-version":[{"id":10405,"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/posts\/10231\/revisions\/10405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/media\/10158"}],"wp:attachment":[{"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/media?parent=10231"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/categories?post=10231"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grupozaragoza.com\/en\/wp-json\/wp\/v2\/tags?post=10231"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}